VATupdate
Hungary

Share this post on

Hungary Releases eVAT M2M Technical Specs, Plans 2027 Go-Live

  • The HTA has published the technical specification for the eVAT system’s M2M interface (v2.0) and the first XSD schemas for submitted documents.
  • This indicates a planned go-live date of 1 January 2027.
  • The current ÁNYK-based filing system will be gradually phased out.

Source: taxand.com

Note that this post was (partially) written with the help of AI. It is always useful to review the original source material, and where needed to obtain (local) advice from a specialist.



Sponsors:

Fiscal Solutions Bottom
VAT IT

Advertisements:

  • advert